Enter your email address:

Delivered by FeedBurner

Blog powered by Typepad

« S&H GREEN STAMPS | Main | Lots of connections to Oregon ....Mike Love is still a Beach Boy at 76 »

March 15, 2017

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

I was there when the span was lifted off the barges while being raised into position between the approach ramps. It wasn't as exciting as expected. I later learned an engineer friend with ODOT was crawling around inside the arches looking for cracks and failures.

The comments to this entry are closed.